OK, so digging a long tunnel underground instead of using a surface train sounds like an expensive way to go. Except, watch this, and do the math with him. The fact that this is a one-lane tunnel and the pumped air ventilation winds are blowing at 90 miles an hour with the traffic seems to be a game changer!
Search this blog
-
Join 223 other subscribers
James Hansen promotes this FREE book as THE solution to climate change!
This free book analyses the limitations of intermittent, dispersed renewable energy
Free poster to download
Recent Comments
My political persuasion
Categories