An analysis by the Breakthrough Institute finds that the entire German solar sector produces less than half the power that Fukushima Daiichi – a single nuclear complex – generated before it was hit by the tsunami. To build a Fukushima-sized solar industry in Germany would, it estimates, cost $155bn. To build a Fukushima-sized nuclear plant would cost $53.5bn. And the power would be there on winter evenings.
Search this blog
Recent Comments
The Crisis
- The Eclipse
(Site summary) - What is peak oil?
(My Zadok article of 2005) - Why now?
- Senate Agreed
- Peak exports
- The speed of growth
- Who is to blame?
- Renewables unreliable and costly
- Biodiesel
- Coal
- Hydrogen
- Tar Sands
- Storing energy
- Doomers and collapse
- Remove subsidies to fossil fuels
- Movies to download
- Oil Depletion Protocol
- What if I'm wrong and we prepare for NOTHING!?
- The Eclipse
Global warming
The Limits to Growth
- Reports on limits
- Peak metals
- Soil and farmland
- Oceans and fisheries
- Forests
- Ecosystem services
- 6 p's of Ecocide = (Still being edited)
Christian stuff
My Categories
Abolish State govts About this blog Activism Aircraft Art and Design Biochar Biodiversity loss Biofuels Charismatic Christian Coal Collapse Computers Creationism Denial Dirty fuels (Fracking, CTL, GTL) Doomer Ecology Economics Electric Vehicles Ethanol EU Family Food Gas Geo-engineering Global Governance Global Warming Gun control Health Hydrogen Industrial Ecosystems Letters Mars Metals & Materials Movies and TV Music New Urbanism Nuclear Ocean Open Source Open Source Hardware Peak Oil Phosphorus Plastic Politics Pollution Population Posters Poverty Rail Renewable energy Robot Cars Rubber Duck (Humour) Sci-Fi Science-Singularity-Robotics Simpol Social Justice Soil Solar Space Storing energy Stress Sydney Anglican Synthetic fuels Transport Uncategorized War Water WindFree poster to download
Free book I recommend
My political persuasion



